Arkwright Summit Wind Farm LLC
Wind power plant · Chautauqua County, New York
Nameplate capacity
78 MW
Rank in New York
#85
of 1,152 plants
In service since
2018
August 2018
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Arkwright Summit Wind Farm LLC
- County
- Chautauqua County
- Generating units
- 1
- Share of state capacity
- 0.18%
- Rank among wind plants in New York
- #22 of 34
- EIA plant code
- 61673
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| WT | Onshore Wind Turbine | 78 MW | 78 MW | 2018 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in New York
| Covanta Hempstead | Other | 79 MW |
| Plant No 2 Freeport | Natural gas | 79 MW |
| Jericho Rise Wind Farm LLC | Wind | 78 MW |
| Hardscrabble Wind Power LLC | Wind | 74 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 78 MW solar plant and a 78 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New York power plants · What New York actually generates