Home / Power plants / New York / 55 Drive BESS

55 Drive BESS

Battery storage power plant · Queens County, New York

Nameplate capacity
4.6 MW
Rank in New York
#578
of 1,152 plants
In service since
2025
March 2025

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
County
Queens County
Generating units
1
Share of state capacity
0.01%
Rank among battery storage plants in New York
#20 of 32
EIA plant code
69803

Generating units

Individual generating units at 55 Drive BESS
UnitTechnologyNameplateSummerOnlineStatus
55DRIBatteries4.6 MW4.6 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in New York

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.6 MW solar plant and a 4.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New York power plants · What New York actually generates