Nameplate capacity
210 MW
Rank in Nevada
#28
of 117 plants
In service since
2024
May 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Yellow Pine Solar II, LLC
- County
- Clark County
- Generating units
- 4
- Share of state capacity
- 1.11%
- Rank among solar plants in Nevada
- #12 of 59
- EIA plant code
- 67091
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| YP2BP | Solar Photovoltaic | 65 MW | 65 MW | 2024 | Operating |
| YP2AP | Solar Photovoltaic | 60 MW | 60 MW | 2024 | Operating |
| YP2AB | Batteries | 53 MW | 53 MW | 2024 | Operating |
| YP2BB | Batteries | 32 MW | 32 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Nevada
| Sun Peak Generating Station | Natural gas | 222 MW |
| Reid Gardner | Battery storage | 220 MW |
| Silver State South Storage | Battery storage | 200 MW |
| Techren Solar II LLC | Solar | 200 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 210 MW solar plant and a 210 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates