Verdi

Hydro power plant · Washoe County, Nevada

Nameplate capacity
2.4 MW
Rank in Nevada
#108
of 117 plants
In service since
2011
January 2011

Details

Primary fuel
Hydro
Technology
Conventional Hydroelectric
Operator
Truckee Meadows Water Authority
County
Washoe County
Generating units
1
Share of state capacity
0.01%
Rank among hydro plants in Nevada
#5 of 6
EIA plant code
6531

Generating units

Individual generating units at Verdi
UnitTechnologyNameplateSummerOnlineStatus
1Conventional Hydroelectric2.4 MW2.4 MW2011Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Nevada

WashoeHydro2.6 MW
FleishHydro2.5 MW
LahontanHydro1.8 MW
Dignity - San MartinSolar1.7 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.4 MW solar plant and a 2.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates