Techren Solar V
Solar power plant · Clark County, Nevada
Nameplate capacity
50 MW
Rank in Nevada
#59
of 117 plants
In service since
2020
December 2020
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Techren Solar V LLC
- County
- Clark County
- Generating units
- 1
- Share of state capacity
- 0.26%
- Rank among solar plants in Nevada
- #32 of 59
- EIA plant code
- 62440
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| TECH5 | Solar Photovoltaic | 50 MW | 50 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Nevada
| Boulder Solar II, LLC | Solar | 50 MW |
| Luning Energy | Solar | 50 MW |
| CM48 | Solar | 48 MW |
| NGP Blue Mountain I LLC | Other | 45 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates