Home / Power plants / Nevada / Silver State Solar Power North

Silver State Solar Power North

Solar power plant · Clark County, Nevada

Nameplate capacity
52 MW
Rank in Nevada
#56
of 117 plants
In service since
2012
May 2012

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Silver State Solar Power North, LLC
County
Clark County
Generating units
1
Share of state capacity
0.27%
Rank among solar plants in Nevada
#29 of 59
EIA plant code
57442

Generating units

Individual generating units at Silver State Solar Power North
UnitTechnologyNameplateSummerOnlineStatus
56188Solar Photovoltaic52 MW50 MW2012Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Nevada

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 52 MW solar plant and a 52 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates