Home / Power plants / Nevada / Sierra Solar Hybrid

Sierra Solar Hybrid

Battery storage power plant · Churchill County, Nevada

Nameplate capacity
400 MW
Rank in Nevada
#13
of 118 plants
In service since
2026
March 2026

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Sierra Pacific Power Co
County
Churchill County
Generating units
1
Share of state capacity
2.07%
Rank among battery storage plants in Nevada
#1 of 5
EIA plant code
67978

Generating units

Individual generating units at Sierra Solar Hybrid
UnitTechnologyNameplateSummerOnlineStatus
SSES1Batteries400 MW400 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Nevada

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 400 MW solar plant and a 400 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates