MDU / NVSS-II

Solar power plant · Nye County, Nevada

Nameplate capacity
14 MW
Rank in Nevada
#89
of 117 plants
In service since
2017
February 2017

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Greenbacker Renewable Energy Corporation
County
Nye County
Generating units
1
Share of state capacity
0.07%
Rank among solar plants in Nevada
#44 of 59
EIA plant code
66983

Generating units

Individual generating units at MDU / NVSS-II
UnitTechnologyNameplateSummerOnlineStatus
822Solar Photovoltaic14 MW14 MW2017Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Nevada

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 14 MW solar plant and a 14 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates