Nameplate capacity
1.0 MW
Rank in Nevada
#114
of 117 plants
In service since
2023
November 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Altus Power America Management, LLC
- County
- Clark County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Nevada
- #56 of 59
- EIA plant code
- 66098
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 573 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Nevada
| Dignity - Siena Campus | Solar | 1.4 MW |
| IGS LAS1 | Solar | 1.0 MW |
| IKEA Las Vegas 462 | Solar | 1.0 MW |
| Speedway North Bldg 1-sllas701 | Solar | 1.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.0 MW solar plant and a 1.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates