Home / Power plants / Nevada / Fort Churchill

Fort Churchill

Natural gas power plant · Lyon County, Nevada

Nameplate capacity
230 MW
Rank in Nevada
#25
of 117 plants
In service since
1968
September 1968

Details

Primary fuel
Natural gas
Technology
Natural Gas Steam Turbine
Operator
Sierra Pacific Power Co
County
Lyon County
Generating units
2
Share of state capacity
1.21%
Rank among natural gas plants in Nevada
#11 of 17
EIA plant code
2330

Generating units

Individual generating units at Fort Churchill
UnitTechnologyNameplateSummerOnlineStatus
1Natural Gas Steam Turbine115 MW113 MW1968Operating
2Natural Gas Steam Turbine115 MW113 MW1971Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Nevada

Dry Lake Solar Energy CenterSolar250 MW
Moapa Southern PaiuteSolar250 MW
Sun Peak Generating StationNatural gas222 MW
Reid GardnerBattery storage220 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 230 MW solar plant and a 230 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates