Nameplate capacity
125 MW
Rank in Nevada
#37
of 117 plants
In service since
2022
March 2022
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Fish Springs Ranch Solar, LLC
- County
- Washoe County
- Generating units
- 2
- Share of state capacity
- 0.66%
- Rank among solar plants in Nevada
- #18 of 59
- EIA plant code
- 64148
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| FISH | Solar Photovoltaic | 100 MW | 100 MW | 2022 | Operating |
| FISHB | Batteries | 25 MW | 25 MW | 2022 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Nevada
| Battle Mountain Solar Project | Solar | 126 MW |
| Crescent Dunes Solar Energy | Solar | 125 MW |
| Western 102 Power Plant | Natural gas | 119 MW |
| McGinness Hills | Other | 104 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 125 MW solar plant and a 125 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates