Morony

Hydro power plant · Cascade County, Montana

Nameplate capacity
63 MW
Rank in Montana
#29
of 73 plants
In service since
1930
January 1930

Details

Primary fuel
Hydro
Technology
Conventional Hydroelectric
Operator
NorthWestern Energy (MT Hydro)
County
Cascade County
Generating units
2
Share of state capacity
0.82%
Rank among hydro plants in Montana
#8 of 23
EIA plant code
2191

Generating units

Individual generating units at Morony
UnitTechnologyNameplateSummerOnlineStatus
MOR1Conventional Hydroelectric32 MW25 MW1930Operating
MOR2Conventional Hydroelectric32 MW25 MW1930Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Montana

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 63 MW solar plant and a 63 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Montana power plants · What Montana actually generates