Home / Power plants / Montana / Judith Gap Wind Energy Center

Judith Gap Wind Energy Center

Wind power plant · Wheatland County, Montana

Nameplate capacity
135 MW
Rank in Montana
#15
of 73 plants
In service since
2005
December 2005

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Invenergy Services LLC
County
Wheatland County
Generating units
1
Share of state capacity
1.76%
Rank among wind plants in Montana
#6 of 23
EIA plant code
56377

Generating units

Individual generating units at Judith Gap Wind Energy Center
UnitTechnologyNameplateSummerOnlineStatus
1Onshore Wind Turbine135 MW135 MW2005Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Montana

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 135 MW solar plant and a 135 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Montana power plants · What Montana actually generates