Home / Power plants / Montana / Clearwater Wind East

Clearwater Wind East

Wind power plant · Custer County, Montana

Nameplate capacity
208 MW
Rank in Montana
#10
of 73 plants
In service since
2024
January 2024

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Portland General Electric Co
County
Custer County
Generating units
1
Share of state capacity
2.71%
Rank among wind plants in Montana
#4 of 23
EIA plant code
66183

Generating units

Individual generating units at Clearwater Wind East
UnitTechnologyNameplateSummerOnlineStatus
CWEOnshore Wind Turbine208 MW208 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Montana

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 208 MW solar plant and a 208 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Montana power plants · What Montana actually generates