New Madrid Solar, LLC
Solar power plant · New Madrid County, Missouri
Nameplate capacity
200 MW
Rank in Missouri
#33
of 139 plants
In service since
2025
November 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- New Madrid Solar, LLC
- County
- New Madrid County
- Generating units
- 1
- Share of state capacity
- 0.86%
- Rank among solar plants in Missouri
- #4 of 37
- EIA plant code
- 69166
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 3603 | Solar Photovoltaic | 200 MW | 162 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Missouri
| Huck Finn Renewable Energy Center | Solar | 200 MW |
| Kelso Solar | Solar | 200 MW |
| Table Rock | Hydro | 200 MW |
| James River Power Station | Natural gas | 198 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 200 MW solar plant and a 200 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Missouri power plants · What Missouri actually generates