Home / Power plants / Missouri / New Madrid Solar, LLC

New Madrid Solar, LLC

Solar power plant · New Madrid County, Missouri

Nameplate capacity
200 MW
Rank in Missouri
#33
of 139 plants
In service since
2025
November 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
New Madrid Solar, LLC
County
New Madrid County
Generating units
1
Share of state capacity
0.86%
Rank among solar plants in Missouri
#4 of 37
EIA plant code
69166

Generating units

Individual generating units at New Madrid Solar, LLC
UnitTechnologyNameplateSummerOnlineStatus
3603Solar Photovoltaic200 MW162 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Missouri

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 200 MW solar plant and a 200 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Missouri power plants · What Missouri actually generates