Sunrise Community Solar

Solar power plant · Chisago County, Minnesota

Nameplate capacity
5.0 MW
Rank in Minnesota
#250
of 804 plants
In service since
2016
December 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Sunrise Community Solar
County
Chisago County
Generating units
5
Share of state capacity
0.03%
Rank among solar plants in Minnesota
#77 of 540
EIA plant code
60713

Generating units

Individual generating units at Sunrise Community Solar
UnitTechnologyNameplateSummerOnlineStatus
SCS1Solar Photovoltaic1.0 MW0.9 MW2016Operating
SCS2Solar Photovoltaic1.0 MW0.9 MW2016Operating
SCS3Solar Photovoltaic1.0 MW0.9 MW2016Operating
SCS4Solar Photovoltaic1.0 MW0.9 MW2016Operating
SCS5Solar Photovoltaic1.0 MW0.9 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Minnesota

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Minnesota power plants · What Minnesota actually generates