Home / Power plants / Minnesota / Leo Community Solar

Leo Community Solar

Solar power plant · Murray County, Minnesota

Nameplate capacity
1.0 MW
Rank in Minnesota
#560
of 804 plants
In service since
2018
December 2018

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Geronimo Power
County
Murray County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in Minnesota
#299 of 540
EIA plant code
61713

Generating units

Individual generating units at Leo Community Solar
UnitTechnologyNameplateSummerOnlineStatus
LEOSolar Photovoltaic1.0 MW1.0 MW2018Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Minnesota

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.0 MW solar plant and a 1.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Minnesota power plants · What Minnesota actually generates