Home / Power plants / Minnesota / Held Solar Project

Held Solar Project

Solar power plant · Stearns County, Minnesota

Nameplate capacity
5.0 MW
Rank in Minnesota
#221
of 804 plants
In service since
2019
March 2019

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Madison Energy Investments LLC
County
Stearns County
Generating units
1
Share of state capacity
0.03%
Rank among solar plants in Minnesota
#50 of 540
EIA plant code
62267

Generating units

Individual generating units at Held Solar Project
UnitTechnologyNameplateSummerOnlineStatus
HELDSolar Photovoltaic5.0 MW5.0 MW2019Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Minnesota

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Minnesota power plants · What Minnesota actually generates