Home / Power plants / Minnesota / Haven Solar Project CSG

Haven Solar Project CSG

Solar power plant · Sherburne County, Minnesota

Nameplate capacity
3.0 MW
Rank in Minnesota
#329
of 804 plants
In service since
2019
July 2019

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Madison Energy Investments LLC
County
Sherburne County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Minnesota
#138 of 540
EIA plant code
62651

Generating units

Individual generating units at Haven Solar Project CSG
UnitTechnologyNameplateSummerOnlineStatus
HAVENSolar Photovoltaic3.0 MW3.0 MW2019Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Minnesota

Grand Casino Hinckley SolarSolar3.0 MW
Grand Meadow (PV)Solar3.0 MW
HazelSolar3.0 MW
Kramer Solar CSGSolar3.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.0 MW solar plant and a 3.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Minnesota power plants · What Minnesota actually generates