Home / Power plants / Minnesota / Fillmore County Solar Project

Fillmore County Solar Project

Solar power plant · Fillmore County, Minnesota

Nameplate capacity
45 MW
Rank in Minnesota
#71
of 804 plants
In service since
2024
December 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Geronimo Power
County
Fillmore County
Generating units
1
Share of state capacity
0.23%
Rank among solar plants in Minnesota
#7 of 540
EIA plant code
67168

Generating units

Individual generating units at Fillmore County Solar Project
UnitTechnologyNameplateSummerOnlineStatus
FILCOSolar Photovoltaic45 MW45 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Minnesota

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 45 MW solar plant and a 45 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Minnesota power plants · What Minnesota actually generates