Cottage Grove CSG, LLC
Solar power plant · Washington County, Minnesota
Nameplate capacity
5.0 MW
Rank in Minnesota
#206
of 804 plants
In service since
2018
March 2018
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Ecoplexus, Inc
- County
- Washington County
- Generating units
- 5
- Share of state capacity
- 0.03%
- Rank among solar plants in Minnesota
- #36 of 540
- EIA plant code
- 61483
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| CTGR1 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2018 | Operating |
| CTGR2 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2018 | Operating |
| CTGR3 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2018 | Operating |
| CTGR4 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2018 | Operating |
| CTGR5 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2018 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Minnesota
| Corcoran CSG | Solar | 5.0 MW |
| Corvus Community Solar | Solar | 5.0 MW |
| Dodge Holdco Solar CSG | Solar | 5.0 MW |
| DodgeSun CSG | Solar | 5.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.0 MW solar plant and a 5.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Minnesota power plants · What Minnesota actually generates