Bingham Solar, LLC
Solar power plant · Clinton County, Michigan
Nameplate capacity
20 MW
Rank in Michigan
#117
of 289 plants
In service since
2020
December 2020
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Geronimo Power
- County
- Clinton County
- Generating units
- 1
- Share of state capacity
- 0.06%
- Rank among solar plants in Michigan
- #21 of 76
- EIA plant code
- 63321
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| BINGH | Solar Photovoltaic | 20 MW | 20 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Michigan
| C W Tippy | Hydro | 20 MW |
| Big Turtle Wind Farm, LLC | Wind | 20 MW |
| Blue Elk I Solar, LLC | Solar | 20 MW |
| Blue Elk II Solar, LLC | Solar | 20 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 20 MW solar plant and a 20 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Michigan power plants · What Michigan actually generates