Assembly Solar II LLC

Solar power plant · Shiawassee County, Michigan

Nameplate capacity
110 MW
Rank in Michigan
#57
of 289 plants
In service since
2021
December 2021

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Assembly Solar II LLC
County
Shiawassee County
Generating units
1
Share of state capacity
0.31%
Rank among solar plants in Michigan
#12 of 76
EIA plant code
63538

Generating units

Individual generating units at Assembly Solar II LLC
UnitTechnologyNameplateSummerOnlineStatus
AS2Solar Photovoltaic110 MW110 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Michigan

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 110 MW solar plant and a 110 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Michigan power plants · What Michigan actually generates