Romeoville 34 - SLCHI234 - BSCHI234
Solar power plant · Will County, Illinois
Nameplate capacity
1.1 MW
Rank in Illinois
#567
of 580 plants
In service since
2025
November 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Prologis Logistics Services Incorporated
- County
- Will County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in Illinois
- #371 of 383
- EIA plant code
- 68235
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| C234B | Solar Photovoltaic | 1.1 MW | 1.1 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Illinois
| NorthropGrummanSolar(Rolling Meadows,IL) | Solar | 1.1 MW |
| Rockton | Hydro | 1.1 MW |
| SAE Taylorville IL S1 | Solar | 1.1 MW |
| ESIL-PFCHICAGO 2, LLC | Solar | 1.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.1 MW solar plant and a 1.1 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Illinois power plants · What Illinois actually generates