CSG Mt. Morris 2, LLC
Solar power plant · Ogle County, Illinois
Nameplate capacity
2.0 MW
Rank in Illinois
#318
of 580 plants
In service since
2021
April 2021
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- CSG Mt. Morris 2, LLC
- County
- Ogle County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in Illinois
- #131 of 383
- EIA plant code
- 64467
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| MTMO | Solar Photovoltaic | 2.0 MW | 2.0 MW | 2021 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Illinois
| CED Peoria Solar | Solar | 2.0 MW |
| CED Spring Creek Solar | Solar | 2.0 MW |
| Cameron Solar, LLC - (IL) | Solar | 2.0 MW |
| Cattail (CSG) | Solar | 2.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.0 MW solar plant and a 2.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Illinois power plants · What Illinois actually generates