Bennington Wind
Wind power plant · Marshall County, Illinois
Nameplate capacity
93 MW
Rank in Illinois
#112
of 580 plants
In service since
2021
October 2021
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Minonk Stewardship Wind LLC
- County
- Marshall County
- Generating units
- 1
- Share of state capacity
- 0.18%
- Rank among wind plants in Illinois
- #44 of 56
- EIA plant code
- 63384
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| BENN | Onshore Wind Turbine | 93 MW | 93 MW | 2021 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Illinois
| Prairie State Solar Project | Solar | 99 MW |
| Hoopeston Wind LLC | Wind | 98 MW |
| Bishop Hill II Wind Farm | Wind | 81 MW |
| University of Illinois Abbott Power Plt | Natural gas | 80 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 93 MW solar plant and a 93 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Illinois power plants · What Illinois actually generates