Home / Power plants / District of Columbia / NCS Paradise LLC

NCS Paradise LLC

Solar power plant · District of Columbia County, District of Columbia

Nameplate capacity
1.3 MW
Rank in District of Columbia
#15
of 21 plants
In service since
2021
May 2021

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
New Columbia Solar
County
District of Columbia County
Generating units
1
Share of state capacity
1.80%
Rank among solar plants in District of Columbia
#11 of 17
EIA plant code
68280

Generating units

Individual generating units at NCS Paradise LLC
UnitTechnologyNameplateSummerOnlineStatus
10021Solar Photovoltaic1.3 MW1.3 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in District of Columbia

IGS CC, LLCSolar1.5 MW
DC WaterSolar1.3 MW
WW-DC Solar 1, LLCSolar1.2 MW
NCS FCPA LLCSolar1.1 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.3 MW solar plant and a 1.3 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All District of Columbia power plants · What District of Columbia actually generates