Home / Power plants / Colorado / Xcel Adams 2 Community Solar Array

Xcel Adams 2 Community Solar Array

Solar power plant · Adams County, Colorado

Nameplate capacity
1.5 MW
Rank in Colorado
#301
of 326 plants
In service since
2017
December 2017

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
MN8 Energy LLC
County
Adams County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in Colorado
#166 of 184
EIA plant code
60725

Generating units

Individual generating units at Xcel Adams 2 Community Solar Array
UnitTechnologyNameplateSummerOnlineStatus
ADCO2Solar Photovoltaic1.5 MW1.5 MW2017Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Colorado

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.5 MW solar plant and a 1.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates