Home / Power plants / Colorado / Twin Buttes Wind Project

Twin Buttes Wind Project

Wind power plant · Bent County, Colorado

Nameplate capacity
75 MW
Rank in Colorado
#70
of 326 plants
In service since
2007
July 2007

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Avangrid Power LLC
County
Bent County
Generating units
1
Share of state capacity
0.33%
Rank among wind plants in Colorado
#23 of 33
EIA plant code
56460

Generating units

Individual generating units at Twin Buttes Wind Project
UnitTechnologyNameplateSummerOnlineStatus
WT1Onshore Wind Turbine75 MW75 MW2007Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Colorado

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 75 MW solar plant and a 75 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates