Pivot Solar 34
Solar power plant · Boulder County, Colorado
Nameplate capacity
4.5 MW
Rank in Colorado
#172
of 326 plants
In service since
2025
September 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Pivot Energy
- County
- Boulder County
- Generating units
- 1
- Share of state capacity
- 0.02%
- Rank among solar plants in Colorado
- #64 of 184
- EIA plant code
- 69016
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PI34 | Solar Photovoltaic | 4.5 MW | 4.5 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Colorado
| CBEP SOLAR 6, LLC | Solar | 4.5 MW |
| DIA 8 | Solar | 4.5 MW |
| Vinelands Power Plant | Hydro | 4.5 MW |
| Fort Carson Battery Energy Storage Syste | Battery storage | 4.2 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.5 MW solar plant and a 4.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates