Home / Power plants / Colorado / Pivot Solar 2 LLC (CSG)

Pivot Solar 2 LLC (CSG)

Solar power plant · Morgan County, Colorado

Nameplate capacity
1.5 MW
Rank in Colorado
#285
of 326 plants
In service since
2022
December 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Nautilus Solar Solutions
County
Morgan County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in Colorado
#151 of 184
EIA plant code
64651

Generating units

Individual generating units at Pivot Solar 2 LLC (CSG)
UnitTechnologyNameplateSummerOnlineStatus
SCSolar Photovoltaic1.5 MW1.5 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Colorado

About this data

From EIA’s inventory of operable generators, June 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.5 MW solar plant and a 1.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates