Home / Power plants / Colorado / Pike Solar Hybrid

Pike Solar Hybrid

Solar power plant · El Paso County, Colorado

Nameplate capacity
175 MW
Rank in Colorado
#41
of 326 plants
In service since
2023
December 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Duke Energy Renewables Services
County
El Paso County
Generating units
1
Share of state capacity
0.76%
Rank among solar plants in Colorado
#6 of 184
EIA plant code
64212

Generating units

Individual generating units at Pike Solar Hybrid
UnitTechnologyNameplateSummerOnlineStatus
CO465Solar Photovoltaic175 MW175 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Colorado

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 175 MW solar plant and a 175 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates