Palmer Solar
Solar power plant · El Paso County, Colorado
Nameplate capacity
60 MW
Rank in Colorado
#73
of 326 plants
In service since
2020
April 2020
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Duke Energy Renewables Services
- County
- El Paso County
- Generating units
- 1
- Share of state capacity
- 0.26%
- Rank among solar plants in Colorado
- #15 of 184
- EIA plant code
- 62495
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 20181 | Solar Photovoltaic | 60 MW | 60 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Colorado
| Spring Canyon Expansion Wind Energy Ctr | Wind | 63 MW |
| Peak View Wind Farm | Wind | 61 MW |
| Spring Canyon | Wind | 60 MW |
| Busch Ranch II Wind Farm | Wind | 59 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 60 MW solar plant and a 60 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates