Oak Leaf Solar XXI (CSG)
Solar power plant · Arapahoe County, Colorado
Nameplate capacity
1.5 MW
Rank in Colorado
#279
of 326 plants
In service since
2018
December 2018
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Greenbacker Renewable Energy Corporation
- County
- Arapahoe County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Colorado
- #145 of 184
- EIA plant code
- 62243
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 53964 | Solar Photovoltaic | 1.5 MW | 1.5 MW | 2018 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Colorado
| Oak Leaf - CSG Portfolio (OL 39) | Solar | 1.5 MW |
| Oak Leaf - CSG Portfolio (OL 44) | Solar | 1.5 MW |
| Oak Leaf Solar XXII LLC (CSG) | Solar | 1.5 MW |
| Oak Leaf Solar XXIII LLC (CSG) | Solar | 1.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.5 MW solar plant and a 1.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates