Front Range Project
Other power plant · Weld County, Colorado
Nameplate capacity
3.2 MW
Rank in Colorado
#197
of 326 plants
In service since
2011
October 2011
Details
- Primary fuel
- Other
- Technology
- Landfill Gas
- Operator
- Timberline Energy LLC
- County
- Weld County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among other plants in Colorado
- #8 of 11
- EIA plant code
- 59143
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| FR-1 | Landfill Gas | 3.2 MW | 3.1 MW | 2011 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Colorado
| ECA CO Greeley | Solar | 3.3 MW |
| DADS Gas Recovery | Other | 3.2 MW |
| Foothills Hydro Plant | Hydro | 3.1 MW |
| Boulder City Betasso Hydro Plant | Hydro | 3.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.2 MW solar plant and a 3.2 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates