Home / Power plants / Colorado / East Victory Way Solar

East Victory Way Solar

Solar power plant · Moffat County, Colorado

Nameplate capacity
4.0 MW
Rank in Colorado
#177
of 326 plants
In service since
2023
November 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
East Victory Way Solar LLC
County
Moffat County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Colorado
#67 of 184
EIA plant code
66945

Generating units

Individual generating units at East Victory Way Solar
UnitTechnologyNameplateSummerOnlineStatus
YVEASolar Photovoltaic4.0 MW4.0 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Colorado

Bar DSolar4.0 MW
CBEP Solar 4, LLCSolar4.0 MW
Gaylord Rockies CHPNatural gas4.0 MW
I25 Battery StorageBattery storage4.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.0 MW solar plant and a 4.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates