Dolores Canyon Solar

Solar power plant · Dolores County, Colorado

Nameplate capacity
110 MW
Rank in Colorado
#59
of 326 plants
In service since
2025
November 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Tri-State G & T Assn, Inc
County
Dolores County
Generating units
1
Share of state capacity
0.48%
Rank among solar plants in Colorado
#11 of 184
EIA plant code
64858

Generating units

Individual generating units at Dolores Canyon Solar
UnitTechnologyNameplateSummerOnlineStatus
C0497Solar Photovoltaic110 MW110 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Colorado

Plains End II LLCNatural gas118 MW
Plains EndNatural gas114 MW
Crossing Trails Wind Power Project LLC.Wind104 MW
Fort LuptonNatural gas101 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 110 MW solar plant and a 110 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates