Denver Intl Airport IV Solar
Solar power plant · Denver County, Colorado
Nameplate capacity
1.5 MW
Rank in Colorado
#265
of 326 plants
In service since
2014
July 2014
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Denver Int'l Airport IV Solar
- County
- Denver County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Colorado
- #131 of 184
- EIA plant code
- 59462
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| DIA4 | Solar Photovoltaic | 1.5 MW | 1.5 MW | 2014 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Colorado
| Conejos 1 Community Solar Array | Solar | 1.5 MW |
| Coyote Ridge Community Solar | Solar | 1.5 MW |
| Gilcrest Solar | Solar | 1.5 MW |
| Logan 1 Community Solar Array | Solar | 1.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.5 MW solar plant and a 1.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates