Nameplate capacity
1,006 MW
Rank in Colorado
#4
of 326 plants
In service since
1968
June 1968
Details
- Primary fuel
- Natural gas
- Technology
- Natural Gas Steam Turbine
- Operator
- Public Service Co of Colorado
- County
- Adams County
- Generating units
- 4
- Share of state capacity
- 4.39%
- Rank among natural gas plants in Colorado
- #2 of 30
- EIA plant code
- 469
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 4 | Natural Gas Steam Turbine | 381 MW | 310 MW | 1968 | Operating |
| 7 | Natural Gas Fired Combined Cycle | 255 MW | 240 MW | 2015 | Operating |
| 5 | Natural Gas Fired Combined Cycle | 185 MW | 168 MW | 2015 | Operating |
| 6 | Natural Gas Fired Combined Cycle | 185 MW | 168 MW | 2015 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Colorado
| Comanche (CO) | Coal | 1,253 MW |
| Fort St Vrain | Natural gas | 1,149 MW |
| Rawhide | Coal | 800 MW |
| Rocky Mountain Energy Center | Natural gas | 685 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1,006 MW solar plant and a 1,006 MW nuclear plant have the same entry here and produce very different amounts of electricity.