Airport Industrial
Other power plant · Pueblo County, Colorado
Nameplate capacity
10 MW
Rank in Colorado
#112
of 326 plants
In service since
2002
January 2002
Details
- Primary fuel
- Other
- Technology
- Petroleum Liquids
- Operator
- Black Hills Colorado Electric, LLC
- County
- Pueblo County
- Generating units
- 4
- Share of state capacity
- 0.04%
- Rank among other plants in Colorado
- #3 of 11
- EIA plant code
- 7995
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| IC1 | Petroleum Liquids | 2.5 MW | 2.5 MW | 2002 | Operating |
| IC2 | Petroleum Liquids | 2.5 MW | 2.5 MW | 2002 | Operating |
| IC3 | Petroleum Liquids | 2.5 MW | 2.5 MW | 2002 | Operating |
| IC4 | Petroleum Liquids | 2.5 MW | 2.5 MW | 2002 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Colorado
| Towaoc | Hydro | 11 MW |
| Overland | Solar | 11 MW |
| Clear Spring Ranch PV Project | Solar | 10 MW |
| Rocky Ford | Other | 10 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 10 MW solar plant and a 10 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Colorado power plants · What Colorado actually generates