Home / Power plants / Alaska / Pelican

Pelican

Hydro power plant · Skagway Hoonah Angoon County, Alaska

Nameplate capacity
2.4 MW
Rank in Alaska
#99
of 150 plants
In service since
1984
May 1984

Details

Primary fuel
Hydro
Technology
Conventional Hydroelectric
Operator
Pelican Utility
County
Skagway Hoonah Angoon County
Generating units
5
Share of state capacity
0.08%
Rank among hydro plants in Alaska
#24 of 30
EIA plant code
6702

Generating units

Individual generating units at Pelican
UnitTechnologyNameplateSummerOnlineStatus
HC2Conventional Hydroelectric0.8 MW0.1 MW1984Out of service and NOT expected to return to service in next calendar year
HC1Conventional Hydroelectric0.6 MW0.5 MW1984Operating
IC10Petroleum Liquids0.4 MW0.4 MW2026Operating
IC7Petroleum Liquids0.4 MW0.4 MW2008Operating
IC9Petroleum Liquids0.2 MW0.2 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Alaska

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.4 MW solar plant and a 2.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Alaska power plants · What Alaska actually generates