Kotzebue Hybrid
Other power plant · NORTHWEST ARCTIC County, Alaska
Nameplate capacity
17 MW
Rank in Alaska
#40
of 150 plants
In service since
1987
August 1987
Details
- Primary fuel
- Other
- Technology
- Petroleum Liquids
- Operator
- Kotzebue Electric Assn Inc
- County
- NORTHWEST ARCTIC County
- Generating units
- 27
- Share of state capacity
- 0.53%
- Rank among other plants in Alaska
- #13 of 92
- EIA plant code
- 6304
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 10 | Petroleum Liquids | 3.0 MW | 3.0 MW | 1992 | Operating |
| 14 | Petroleum Liquids | 2.8 MW | 2.8 MW | 1994 | Operating |
| 15 | Petroleum Liquids | 2.8 MW | 2.8 MW | 2006 | Operating |
| 16 | Petroleum Liquids | 1.4 MW | 1.4 MW | 2013 | Operating |
| ES1 | Batteries | 1.2 MW | 1.2 MW | 2015 | Operating |
| 7A | Petroleum Liquids | 1.1 MW | 1.1 MW | 1987 | Operating |
| 18WT | Onshore Wind Turbine | 0.9 MW | 0.9 MW | 2012 | Operating |
| 19WT | Onshore Wind Turbine | 0.9 MW | 0.9 MW | 2012 | Operating |
| 17 | Petroleum Liquids | 0.7 MW | 0.7 MW | 2016 | Operating |
| 11wt | Onshore Wind Turbine | 0.1 MW | 0.1 MW | 2005 | Operating |
| PV1 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2020 | Operating |
| PV10 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2023 | Operating |
| PV11 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2023 | Operating |
| PV12 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2023 | Operating |
| PV13 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2023 | Operating |
| PV14 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2023 | Operating |
| PV15 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2023 | Operating |
| PV16 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2023 | Operating |
| PV17 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2023 | Operating |
| PV2 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2020 | Operating |
| PV3 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2020 | Operating |
| PV4 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2020 | Operating |
| PV5 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2020 | Operating |
| PV6 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2020 | Operating |
| PV7 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2020 | Operating |
| PV8 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2020 | Operating |
| PV9 | Solar Photovoltaic | 0.1 MW | 0.1 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Alaska
| Unisea G 2 | Other | 18 MW |
| Barrow | Natural gas | 17 MW |
| Naknek | Other | 17 MW |
| Blue Lake Hydro | Hydro | 16 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 17 MW solar plant and a 17 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Alaska power plants · What Alaska actually generates